Skip to main content

Black Tusk Resources Inc. Completes Reconnaissance Exploration on South Rim Gold Project, Central British Columbia

VANCOUVER, BC / ACCESSWIRE / August 19, 2021 / Black Tusk Resources Inc. ("Black Tusk" or the “Company”) (CSE:TUSK)(OTC PINK:BTKRF)(FRA:0NB) is pleased to announce the completion of reconnaissance exploration on the South Rim property located in central British Columbia. The South Rim property comprises four claims totalling 1,771.33 hectares. The project is located approximately 140 kilometres south of Smithers, in central British Columbia.

Black Tusk's geologic crew visited the property between August 12 and August 16 to map and sample documented mineral showings as well as testing of other areas. Access was by helicopter from Smithers, BC, with flying time from Smithers to the property of 1 hour each way.

Black Tusk announced the acquisition of the project in 2020, and released information regarding historically mapped and sampled mineralization at that time. The project has undergone a number of exploration programs dating back to 1967. These were designed to explore for gold and molybdenum. This work eventually led to the discovery of mineral occurrences that are now documented in the BC Mineral Inventory database, as well as within company reports.

The Black Tusk crew visited and recorded 24 sites during the week's reconnaissance. A total of 19 rock samples were obtained during the reconnaissance. The majority of these were of vuggy quartz-carbonate veining (epithermal style), some locations of which were documented in previous reports (see news release dated July 19, 2021).

Summary of 2021 reconnaissance mapping and sampling

Sample

Type

UTMZn

E

N

Description (brief)

SRPG-01chips9 U6138935922973Quartz Vein
SRPG-02grab9 U6139245922958Quartz Vein
SRPG-03grab9 U6141315922478Float, volcanic breccia
SRPG-04chips9 U6140755922378Volcanic breccia with veining
SRPG-05grab9 U6140735922388Float, quartz vein, vuggy
SRPG-06grab9 U6134855923257Float, quartz vein, vuggy
SRPG-07chips9 U6134385923285Stinger quartz veins in volcanic
SRPG-08grab9 U6133285923398Float, quartz vein, vuggy
SRPG-09chips9 U61324959234365-10cm quartz quartz vein in volcanic breccia
SRPG-10chips9 U6132765923494Quartz vein 10-30cm rusty with dyke or shear zone
SRPG-11chips9 U61278259236893 meter silicified dacitic dyke with fine pyrite
SRPG-12grab9 U6127605923679Grabs of assorted vein and volcanic rocks
  9 U6155075922317Andesite volcanic with potassic alteration and fine pyrite
SRPG-13chips9 U6155335922305Silicified and potassic altered volcanic
  9 U6120755923792Mapped purple volcanic outcrop
SRPG-14chips9 U61208259237565-10m wide alteration zone, quartz veins and pyrite
SRPG-15chips9 U61206559238542m wide shear with vuggy quartz
SRPG-16chips9 U6107735924318Black volcanic silicified and fine pyrite, minor veins
  9 U6106145924300Creek gulley not accessed
SRPG-17chips9 U6131185924622Quartz carbonate breccia vein, about 30cm
  9 U6131495924659Altered volcanic with 20cm quartz vein
SRPG-18chips9 U6131225924631Quartz vein 30-40cm wide vn in rusty volcanic
SRPG-19grab9 U6133255926507Rusty oc along stream bank with minor carbonate veining


Rock samples obtained during site reconnaissance were continuously under control of the Black Tusk crew and were dropped directly to ALS Labs in Kamloops BC. ALS Labs have been directed to process samples for gold content using their code AU-AA26 (fire assay and AAS), and silver using their code AG-OG62 (acid digestion with HCl leach, ICP AES). Samples will also be screened for 51 elements using ALS code ME-MS41 (aqua regia with ICP-MS finish). Black Tusk will continue to undertake Quality Assurance and Control by placing a "standard materials" packet into the sample stream. Results from the Lab are expected in the next month.

The property lies within geologic terrain that hosts the Huckleberry Copper-Molybdenum Mine (closed) located 23 kilometres to the north of the South Rim Property. The Huckleberry Mine contains remaining reserves of 35 million tonnes of proven and probable grading 0.32 % copper and 0.01 % molybdenum, with measured and indicated resources of 180 million tonnes grading 0.32 % copper and 0.01 % molybdenum (Imperial Metals website, February, 2020)

The Ootsa Project is located on the south shore of the Nechako Reservoir, 6 km from the Huckleberry copper-molybdenum mine. The Ootsa project contains an estimated measured and indicated resource of 224 million tonnes grading 0.22 % copper, .021 % molybdenum and 0.15 gpt gold (Surge Copper Corporation website, January, 2020).

(The reader is cautioned that resources that exist on regional or adjacent properties are not necessarily indicative of potential on the Black Tusk -South Rim Project.)

Perry Grunenberg, P.Geo, a qualified professional, as that term is defined under National Instrument 43-101, has compiled and reviewed this news release, and undertook the August 2021 exploration work on the South Rim project.

Cautionary Statement

This press release contains forward-looking statements based on assumptions as of that date. These statements reflect management's current estimates, beliefs, intentions and expectations; they are not guarantees of future performance. The Company cautions that all forward-looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many of which are beyond the Company's control. Such factors include, among other things: risks and uncertainties relating to exploration and development; the ability of the Company to obtain additional financing; the Company's limited operating history; the need to comply with environmental and governmental regulations; fluctuations in the prices of commodities; operating hazards and risks; competition and other risks and uncertainties, including those described in the Company's Prospectus dated September 8, 2017 available on www.sedar.com. Accordingly, actual and future events, conditions, and results may differ materially from the estimates, beliefs, intentions, and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking information.

On behalf of the Board of Directors

Richard Penn
CEO
(778) 384-8923

South Rim Property Southern Portion (helicopter at center bottom)

South Rim Property Alpine Terrain

South Rim Property Rusty Shear Zone with Vuggy Quartz Veins (epithermal system)

South Rim Property Quartz Breccia Vein (epithermal style)


SOURCE: Black Tusk Resources Inc.



View source version on accesswire.com:
https://www.accesswire.com/660559/Black-Tusk-Resources-Inc-Completes-Reconnaissance-Exploration-on-South-Rim-Gold-Project-Central-British-Columbia

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.