Skip to main content

Buenaventura Announces Third Quarter 2023 Results for Production and Volume Sold per Metal

Compañia de Minas Buenaventura S.A.A. (“Buenaventura” or “the Company”) (NYSE: BVN; Lima Stock Exchange: BUE.LM), Peru’s largest publicly-traded precious metals mining company, today announced 3Q23 results for production and volume sold.

3Q23 Production per Metal

(100% basis)
 
1Q23

(Actual)
2Q23

(Actual)
3Q23

(Actual)
9M23

(Actual)

2023 Updated

Guidance (1)(2)

 
Gold (Oz.)
Orcopampa

19,996

19,975

20,576

60,547

72.0k - 80.0k
Tambomayo

10,600

10,896

8,127

29,623

35.0k - 40.0k
Coimolache

6,536

9,632

23,621

39,789

60.0k - 65.0k
El Brocal

4,421

4,377

5,833

14,631

19.0k - 22.0k

 

 

 

 

Silver (Oz.)

 

 

 

 

Uchucchacua

0

0

0

0

0.7M - 1.0M
Yumpag

0

0

0

0

1.6M - 1.8M
El Brocal

436,678

635,530

1,192,944

2,265,152

2.7M - 3.0M
Tambomayo

394,305

540,732

301,963

1,237,001

1.6M - 1.8M
Julcani

417,887

472,740

427,269

1,317,895

1.7M - 1.9M

 

 

 

 

Lead (MT)

 

 

 

 

El Brocal

0

1,275

885

2,160

5.0k - 6.0k
Uchucchacua

0

0

0

0

1.4k - 1.5k
Yumpag

0

0

0

0

0.3k - 0.4k
Tambomayo

1,324

924

603

2,851

2.9k - 3.2k

 

 

 

 

Zinc (MT)

 

 

 

 

El Brocal

0

3,812

2,849

6,661

15.0k - 20.0k
Uchucchacua

0

0

0

0

2.0k - 2.2k
Yumpag

0

0

0

0

-

Tambomayo

1,552

1,150

913

3,614

4.8k - 5.3k

 

 

 

 

Copper (MT)

 

 

 

 

El Brocal

12,238

13,213

18,826

44,277

53.0k - 58.0k
  1. Above 2023 projections are considered forward-looking statements and represent management’s good faith estimates or expectations of future production results as of September 2023.
  2. El Brocal stockpiled ore mined from its open pit during the 1Q23. Lead and zinc ore are being treated at the processing plant starting in 2Q23. The underground mine will operate continuously throughout 2023.

3Q23 Comments

Tambomayo:

  • Gold, lead and zinc production was in line with 3Q23 expectations. 2023 gold, lead and zinc guidance remain unchanged.
  • Silver production was lower than expected during the quarter due to a lower than planned mining rate within the mine's upper zone, which required more extensive rehabilitation and support to enable access to high-grade ore. 2023 silver guidance has been updated.

Orcopampa:

  • 3Q23 gold production was in line with 3Q23 expectations. 2023 gold guidance remains unchanged.

Coimolache:

  • 3Q23 gold production exceeded expectations due increased treated ore and higher gold grades. Increased production was also due to increased ounce recovery and percolation times during the quarter, as the Company is now fully recovering gold placed on the leach pad during the first half of 2023. This is expected to stabilize during 4Q23, with production in line with 3Q23. 2023 gold guidance therefore remains unchanged.

Julcani:

  • 3Q23 silver production was below projections due to a negative geology reconciliation and decreased treated ore. 2023 silver guidance has been updated.
  • Exploration and preparation of Julcani’s Rosario sector, which lies below the 610 level, began during 3Q23. This new zone includes gold and copper which Buenaventura will begin processing during the fourth quarter 2023. The Company will also submit a related reserves and resources analysis by year end 2023.

Uchucchacua:

  • Buenaventura submitted Uchucchacua’s updated mine plan to the Peruvian Ministry of Energy and Mines on August 28, 2023. Buenaventura initiated a short ore processing campaign at the processing plant, ensuring the plants operational readiness to take delivery of ore from Uchucchacua and Yumpag during the 4Q23 as planned. Exploration and mine development progressed as scheduled during 3Q23.

Yumpag:

  • The Yumpag project’s Environmental Impact Assessment (EIA) was approved on September 7, 2023. The Company promptly submitted a request to the Peruvian Ministry of Energy and Mines to obtain the necessary authorizations to initiate the deposit’s exploitation. However, 4Q23 targeted production initiation remains unchanged, as resumed activities at the Uchucchacua processing plant also enables Buenaventura to perform metallurgical tests for up to 124,600 tons of ore from the Yumpag project’s pilot stope.
  • Yumpag’s ore concentrates will be processed at the Rio Seco plant to reduce manganese content. The Rio Seco plant is scheduled to resume operations in November 2023.

El Brocal:

  • Gold production was lower than expected during the third quarter due to mine plan rescheduling for the underground mine, to prioritize higher copper grades. 2023 gold guidance has been updated.
  • 3Q23 silver production was in line with 3Q23 expectations. 2023 silver guidance remains unchanged.
  • On October 3, 2023, Buenaventura submitted a notice to the Peruvian Ministry of Energy and Mines (MINEM) for the temporary suspension of mining activities at Colquijirca’s Tajo Norte mine for up to three years due to a delay of Colquijirca’s Modification of Environmental Impact Assessment approval.
  • Lead and zinc production was lower than expected during the quarter as the 20x30 mill PPM was completed in September, earlier than originally planned, to proactively ensure certain detected anomalies were rectified, avoiding potentially compromising the transmission system. Lead and zinc production expected for 2023 will therefore be carried forward into early 2024. 2023 lead and zinc guidance has been updated.
  • 3Q23 copper production exceeded projections as underground mine production ramp-up continued ahead of expectations during the quarter. Transitional ore from the open pit also had a higher than estimated copper content with improved metallurgical recovery. Buenaventura maintains its targeted underground mine 10,000 tpd exploitation rate for 4Q23.

3Q23 Payable Volume Sold

3Q23 Volume Sold per Metal

(100% basis)
 
1Q23

(Actual)
2Q23

(Actual)
3Q23

(Actual)
9M23

(Actual)
 
Gold (Oz.)
Orcopampa

20,326

19,718

20,460

60,504

Tambomayo

9,360

9,868

7,421

26,649

Coimolache

6,854

8,170

21,237

36,261

El Brocal

2,595

2,427

3,553

8,575

 

 

 

 

Silver (Oz.)

 

 

 

 

Uchucchacua

130,642

150,637

85,499

366,778

Yumpag

0

0

0

0

El Brocal

379,158

508,257

986,583

1,873,998

Tambomayo

370,299

485,593

269,542

1,125,434

Julcani

412,890

449,841

388,854

1,251,585

 
Lead (MT)
El Brocal

88

1,215

636

1,939

Uchucchacua

0

0

0

0

Yumpag

0

0

0

0

Tambomayo

1,189

808

525

2,521

 

 

 

 

Zinc (MT)

 

 

 

 

El Brocal

38

3,094

2,347

5,478

Uchucchacua

0

0

0

0

Tambomayo

1,269

895

682

2,846

 

 

 

 

Copper (MT)

 

 

 

 

El Brocal

11,748

12,355

17,786

41,889

 
Realized Metal Prices*
 
1Q23

(Actual)
2Q23

(Actual)
3Q23

(Actual)
9M23

(Actual)
Gold (Oz)

1,915

1,945

1,921

1,927

Silver (Oz)

22.5

24.27

25.67

24.30

Lead (MT)

2,139

1,846

2,225

2,030

Zinc (MT)

2,004

2,497

1,762

2,152

Copper (MT)

8,972

8,992

8,291

8,689

 
*Buenaventura consolidated figures.

Appendix

Appendix

 

1. 3Q23 Production per Metal

(100% basis)
 
1Q23

(Actual)
2Q23

(Actual)
3Q23

(Actual)
9M23

(Actual)
 
Gold (Oz.)
La Zanja

3,051

2,030

1,692

6,772

 

 

 

 

Silver (Oz.)

 

 

 

 

Orcopampa

7,618

7,242

7,168

22,028

La Zanja

6,630

5,322

3,681

15,633

Coimolache

25,485

64,084

87,185

176,755

 

 

 

 

Lead (MT)

 

 

 

 

Julcani

106

159

132

398

 
2. 3Q23 Volume Sold per Metal
(100% basis)
 
1Q23

(Actual)
2Q23

(Actual)
3Q23

(Actual)
6M23

(Actual)
 
Gold (Oz.)
La Zanja

3,211

1,892

1,780

6,883

 

 

 

 

Silver (Oz.)

 

 

 

 

Orcopampa

6,699

6,023

6,710

19,432

La Zanja

10,942

11,589

6,442

28,973

Coimolache

24,909

57,608

82,379

164,895

 

 

 

 

Lead (MT)

 

 

 

 

Julcani

94

138

107

339

Company Description 

Compañía de Minas Buenaventura S.A.A. is Peru’s largest, publicly traded precious and base metals Company and a major holder of mining rights in Peru. The Company is engaged in the exploration, mining development, processing and trade of gold, silver and other base metals via wholly-owned mines and through its participation in joint venture projects. Buenaventura currently operates several mines in Peru (Orcopampa*, Uchucchacua*, Julcani*, Tambomayo*, La Zanja*, El Brocal and Coimolache).

The Company owns 19.58% of Sociedad Minera Cerro Verde, an important Peruvian copper producer (a partnership with Freeport-McMorRan Inc. and Sumitomo Corporation).

(*) Operations wholly owned by Buenaventura

Note on Forward-Looking Statements 

This press release may contain forward-looking information (as defined in the U.S. Private Securities Litigation Reform Act of 1995) that involve risks and uncertainties, including those concerning Cerro Verde’s costs and expenses, results of exploration, the continued improving efficiency of operations, prevailing market prices of gold, silver, copper and other metals mined, the success of joint ventures, estimates of future explorations, development and production, subsidiaries’ plans for capital expenditures, estimates of reserves and Peruvian political, economic, social and legal developments. These forward-looking statements reflect the Company’s view with respect to Cerro Verde’s future financial performance. Actual results could differ materially from those projected in the forward-looking statements as a result of a variety of factors discussed elsewhere in this Press Release.

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.